China Petroleum Exploration ›› 2006, Vol. 11 ›› Issue (3): 63-67,8.

Previous Articles     Next Articles

Issueon ExplorationEngineeringCost andMethod toResponse/

Zhang Xia   

  • Online:2006-06-15 Published:2006-06-15

Abstract: Due to the status of the quota of exploration engineering lagging behind the technique development of exploration engineering and rating arrangement system being under disorder, the management of exploration engineering costing should get out of the error concept that regarded the quota as pricing, and as only one factor of investment control , resume theòneuteró nature of quota and set up the quota according to its essence requirement in order to enhance the quota's foundation. Beyond the disputing on related òbenefitsó, the quota can be brought into the consumption standard system, so the investment control should be limited by means of the total gross control and benefit index restricting

Key words: rating level, management manner, investment control, benefit goal