• • 上一篇    下一篇

长庆油田水平井体积压裂工具发展浅析

任 勇1,2冯长青1,2胡相君1,2张文星1,2何 华1,2蒙 鑫1,2赵粉霞1,2   

  1. 1 低渗透油气田勘探开发国家工程实验室;2 中国石油长庆油田公司油气工艺研究院
  • 出版日期:2015-03-15 发布日期:2015-05-21
  • 作者简介:任勇(1981-),男,重庆人,2005 年毕业于西南石油学院,高级工程师,主要从事油田水平井分段压裂管柱以及工具的 研发和现场试验工作。地址:陕西省西安市未央区明光路长庆油田油气工艺研究院,邮政编码:710018。 E-mail:ryong_cq@petrochina.com.cn
  • 基金资助:
    国家科技重大专项鄂尔多斯盆地大型低渗透岩性地层油气藏开发示范工程(2011ZX05044)

Analysis of Volume-fracturing Tools Developed for Horizontal Wells in Changqing Oil?eld

Ren Yong1,2,FengChangqing1,2,Hu Xiangjun1,2,Zhang Wenxing1,2,He Hua1,2,Meng Xing1,2,Zhao Fenxia1,2   

  1. 1 State Engineering Laboratory for Exploration and Development of Low-permeability Oil & Gas Fields; 2 Oil & Gas Technology Research Institute of ,PetroChina Changqing Oilfield Companyt
  • Online:2015-03-15 Published:2015-05-21

摘要: 长庆油田致密油资源丰富,水平井钻井及体积压裂工艺是主要开发方式,而体积压裂工具是工艺实现的 关键。通过对前期水平井分段改造管柱及配套工具对比分析,结合体积压裂工艺在作业排量、多簇射孔方式等方面对 工具的要求,重点介绍了水力喷射分段多簇体积压裂工具、大通径快钻桥塞压裂工具和可开关套管滑套压裂工具。结 果表明,在139.7mm 套管固井完井条件下,当施工总排量低于8m3/min 时,水力喷射分段多簇体积压裂工具具有 操作简单、作业成本低的优点,成为长庆油田水平井体积压裂主体工具,已规模应用505 口油田水平井;当施工排量 超过8m3/min 时,则采用大通径快钻桥塞压裂工具,该工具压后无需钻磨,可直接放喷、投产,已在长庆油田应用 井数42 口;而可开关套管滑套压裂工具不仅可以满足大排量压裂改造,还考虑了后期分层测试以及找水、堵水、重 复改造等需要,将是最具有发展潜力的工具,它代表着体积压裂工具的发展方向。

Abstract: Changqing Oilfield is rich in tight oil resources. Drilling of horizontal well and volume-fracturing process are the main methods for development. Volume-fracturing tools hold the key to development process. Based on the analysis comparison of the pipe string and support tools used for staged renovation of horizontal wells in the previous stage and combined with the requirements on the tools for volume-fracturing process and cluster perforation, this paper briefs about hydro-jetting cluster-perforating volume-fracturing tools, large-bore and fast-drilling bridge plug fracturing tools and switchable fracturing sliding sleeve tools with casing. The results indicate that hydro-jetting cluster-perforating tools are advantageous for their simple use and low operating cost under the conditions that 139.7 casing is used for cementation and completion and the pumping rate is less than 8m3/min. Therefore, hydro-jetting cluster-perforating tools become the main volume-fracturing tools for volume-fracturing of horizontal wells in Changqing Oilfield. a total of 505 horizontal wells have been fractured by means of these tools. When the pumping rate exceeds 8m3/min, large-bore and fast-drilling bridge plug fracturing tools are used because no drilling is needed after fractured and the wells can be directly put into production. A total of 42 horizontal wells have been fractured by means of such tools. Switchable fracturing sliding sleeve tool with casing, the most potential for development, can not only meet the need for large-rate fracturing renovation but also the need for later-on layered testing, water plugging and repeated renovations, indicating the development orientation for volume-fracturing tools.