中国石油勘探 ›› 2023, Vol. 28 ›› Issue (2): 133-143.DOI: 10.3969/j.issn.1672-7703.2023.02.012

• 工程技术 • 上一篇    下一篇

苏里格致密砂岩气藏小井眼侧钻水平井配套技术发展与展望

叶成林   

  1. 中国石油集团油田技术服务有限公司
  • 出版日期:2023-03-15 发布日期:2023-03-15
  • 作者简介:叶成林(1982-),男,安徽阜阳人,硕士,2009年毕业于长江大学,高级工程师,现主要从事非常规天然气勘探开发及管理工作。地址:北京市东城区东直门北大街9号中国石油大厦,邮政编码:100007。
  • 基金资助:
    中国石油天然气集团有限公司科技项目“气体钻水平井/侧钻水平井技术研究”(2021DJ4205)。

Development and prospect of support technology of slim hole sidetrack horizontal well for Sulige tight sandstone gas reservoir

Ye Chenglin   

  1. China Petroleum Technical Service Corporation Limited
  • Online:2023-03-15 Published:2023-03-15

摘要: 针对苏里格气田纵向多层系含气、横向储层非均质性强等地质特征,为充分挖潜老区剩余储量,确保气田高效稳产,2011年起,在苏里格气田开展侧钻水平井技术攻关和现场实践,剩余气刻画、地质选井、钻完井、储层改造、排水采气等配套技术逐步完善和提升,形成了一套成熟的苏里格致密砂岩气藏侧钻水平井开发技术。截止到2022年6月底,完钻57口井,平均水平段长度由初期的614.2m增加到753m,钻井周期由初期的63.7天缩短到35天,缩短45.1%,完井周期由91.5天缩短到52.6天,缩短42.5%,2021年首次实现套管完井和φ88.9mm套管桥塞分段压裂,成功率达100%;投产42口井,平均井口压力由9.4MPa增加到13.3MPa,首月平均单井日产量由2.0×104m3增长到4.0×104m3,内部收益率保持在8%以上,经济效益显著。下一步将针对降成本和提产量目标,围绕多元化设计、智能化发展、一体化协作、全生命周期管理等方向开展技术攻关。小井眼侧钻水平井技术为后期苏里格致密砂岩气效益开发提供了技术保障,也可为其他油气田高效动用剩余油气提供技术参考和解决思路。

关键词: 苏里格气田, 剩余储量, 小井眼侧钻水平井, 套管完井, 全生命周期, 采收率

Abstract: Given the complex geological characteristics of Sulige Gasfield, such as multi-layer gas bearing in vertical and strong reservoir heterogeneity in lateral, technology research and field practice of sidetrack horizontal well have been conducted in Sulige Gasfield since 2011, so as to tap the remaining reserves in mature areas and ensure the high-efficiency and stable production of gas field. As a result, a series of supporting technologies, including remaining gas characterization, well location selection, drilling and completion, reservoir reconstruction, and drainage gas recovery, have gradually been improved, and a set of mature sidetrack horizontal well development technologies has been researched for tight sandstone gas reservoir in Sulige Gasfield. By the end of June 2022, 57 wells had been drilled, with the average horizontal section increased from 614.2 m to 753 m, drilling cycle decreased from 63.7 days in the initial stage to 35 days, a decrease of 45.1%, and well completion period decreased from 91.5 days to 52.6 days, a decrease of 42.5%. The cased-hole completion and bridge plug staged fracturing by using φ88.9 mm casing were achieved for the first time in 2021, with a success rate of 100%. Till now, 42 wells have been put into production, with the average wellhead pressure increased from 9.4 MPa to 13.3 MPa, average gas rate increased from 2.0×104m3/d to 4.0×104m3/d of a single well in the first month, and the internal rate of return remained higher than 8%, showing significant economic benefits. Targeting at the goal of cost reduction and production increase, further technology research will be conducted focusing on the diversified design, intelligent development, integrated collaboration, and full-life cycle management. The technology of slim-hole sidetrack horizontal well drilling provides technical support for the beneficial development of Sulige tight sandstone gas reservoir in the late stage and technical reference and solutions for the high-efficiency production of remaining oil and gas in other oilfields.