中国石油勘探 ›› 2020, Vol. 25 ›› Issue (2): 43-50.DOI: 10.3969/j.issn.1672-7703.2020.02.005

• 勘探管理 • 上一篇    下一篇

胜利油田难动用石油储量地质工程一体化探索

万绪新,谢广龙,丁余刚   

  1. 中石化胜利石油工程有限公司
  • 出版日期:2020-03-15 发布日期:2020-03-13
  • 基金资助:
    中石化石油工程公司重点科技攻关项目“难动用石油储量效益动用配套技术”(SHGC2017-8)。

Exploration of geology-engineering integration in hard-to-recover reserves in the Shengli Oilfield

Wan Xuxin, Xie Guanglong, Ding Yugang   

  1. Petroleum Engineering Co., Ltd of Sinopec Shengli Oilfield Company
  • Online:2020-03-15 Published:2020-03-13
  • Supported by:
     

摘要: 难动用石油储量有效开发是大力提升国内石油开发力度的重要举措。胜利油田低渗透和稠油难动用石 油储量近6×108t,占全国10% 以上,有效开发面临油水系统复杂、工艺配套难、产能低等诸多挑战。中石化以胜 利油田为试点,经过两年多合作开发实践,探索出“合作机制创新”“低品位中找甜点”“地质工程一体化”“精细 储层改造、作大产能”等有效做法,初步实现了将难动用石油储量“管起来、动起来、活起来”,累计动用石油储 量4860×104t,建成产能超50×104t,钻井周期缩短60% 以上,单井产量提升40% 左右,平衡油价由75$/bbl 降至 50$/bbl 以内。胜利油田难动用石油储量实践,初步形成独特承包建产方案,打造地质工程一体化全产业链高效模式, 为高勘探程度老油区可持续发展开拓了新方向。

 

关键词: 难动用石油储量, 低渗透, 稠油, 合作开发, 地质工程一体化

Abstract: Effective development of hard-to-recover oil reserves is an important measure for the enhancement of oil development in China. The hard-to-recover reserves of low permeability and heavy oil in the Shengli oilfield are nearly 6×108 t, accounting for more than 10% of the national total. Effective development faces many challenges, such as a complex oil-water system, lack of supporting technologies, and low productivity. Sinopec has adopted the Shengli oilfield as a pilot project. After more than 2 years of practical cooperative development, a number of effective methods have been explored, such as “innovation of cooperative mechanism”, “searching for sweet spots in low-grade reserves”, “geology-engineering integration”, and “fine reservoir stimulation and increasing productivity”. This has preliminarily achieved the goal of “managing, recovering and producing” hard-to-recover oil reserves. The cumulative produced oil reserves are 4860×104 t, established productivity is over 50×104 t, the drilling cycle has been shortened by more than 60%, single well production has increased by about 40%, and the break-even oil price has dropped from 75 $/bbl to within 50 $/bbl. The initial practice of producing hard-to-recover oil reserves in the Shengli oilfield has formed a unique contracted productivity establishment plan and created an efficient model for geology-engineering integration across the whole industry chain. This has opened up a new direction for the sustainable development of mature oil areas with a high degree of exploration.

中图分类号: